Field Notes · Restoration

A canal comes back to work

· San Gregorio Atlapulco

Producers and volunteers waist-deep in a canal, rebuilding its edge with dredged mud

A canal that has silted up is not a lost canal. It is a job. The workday starts early: planks across the mud, buckets, a canoa loaded with sacks, and the slow rhythm of dredging — lifting the black lake mud back onto the bed it built in the first place.

By midday the water is moving again along a stretch that had stood still for years. The mud goes back to the bed; the bed will grow the next season's food; the food will pay for the next stretch of canal. That is the whole system, in one morning's work.

Brigades work days like this one alongside the producers. If your team wants to spend one of them here: join a brigade.